NDEIC Home

Publications


consulting
sales
about rks
publications
contact
events
links

Books

Nondestructive Evaluation, A Tool for Design, Service and Manufacture by Don E. Bray and Roderic K. Stanley, CRC Press, Boca Raton, FL, 1997. ISBN 0-8493-2655-9

Magnetism and Mythology by Roderic K. Stanley. Houston: R. K. Stanley, 19--.

Patents

US Patent 4,710,712
Method and apparatus for measuring defects in ferromagnetic elements

US Patent 4,611,170
Coil apparatus mounted on an axially split spool for indicating wall thickness variations of a length of ferromagnetic pipe

US Patent 4,555,665; UK Patent 2,124,778
Magnetic flux method for measuring tubular wall thickness

Articles (in order of publication)

  1. "Anisotropy of Hc2 in the Hexagonal Tungsten Bronze  RbxWO3,"  R. K. Stanley,  M. R. Skokan, W. C. Morris & W. Moulton, Solid State Commun. 19, 555 (1976).

  2. "Possible New Phase Transition in Hexagonal RbxWO3,"  R. K. Stanley,  W. C. Morris & W. Moulton, Solid State Commun. 27, 1277 (1977).
  3. "Nondestructive Determination of Cs and Rb in the Hexagonal Tungsten Bronzes CsxWO3, and RbxWO3,"  R. K Stanley, Radiochem. & Radioanal. Lett. 41(2) 109 (1979).
  4. "Conduction Properties of the Hexagonal Tungsten Bronze RbxWO3" R. K. Stanley, W. C. Morris & W. Moulton, Physical Review B20(5), 1903 (1979).
  5. "Inspection Oilfield Tubular Goods with Capacitive Discharge Systems," G. L. Moake and R. K. Stanley, Materials Evaluation 41(7), (1983).
  6. "OCTG Inspection Procedures Reviewed; Error Pinpointed," R. K. Stanley & W. A. Konkel, Oil & Gas Journal (1983).
  7. "Magnetic Pipe Inspection; Calibrate for the Real World," R. K. Stanley & W. A. Konkel, World Oil (1983).
  8. "Magnetization of Oilfield Tubular Goods with Capacitive Discharge Systems," R. K. Stanley and G. L. Moake, NDT Intl., 17(3) (1984).
  9. "Basic Principles of Magnetic Flux Leakage Inspection Systems for the Evaluation of Oilfield Tubular Goods," in Electromagnetic Methods of NDT, ed. W. Lord, pub. Gordon & Breach (1985).
  10. "Capacitor Discharge Magnetization of Oil Country Tubular Goods," with G. L. Moake, in Electromagnetic Methods of NDT, ed. W. Lord, pub. Gordon & Breach (1985).
  11. "Circumferential Magnetization of Tubes, and the Measurement of Flux Density in Such Materials," R. K. Stanley, Materials Evaluation 44(8), (1986).
  12. "Training For the Nondestructive Evaluation of Oilfield Tubular Goods," R. K. Stanley, Materials Evaluation 44(9) (1986).
  13.  "Nondestructive Testing Training For the Inspection of Oilfield Tubular Products: The IPIA Approach," R. K. Stanley, Canadian J. of NDT (July 1987).
  14. "Streamline OCTG Inspection," Drilling (Jan 1987).
  15. "Nondestructive Evaluation of the Used Drill Pipe in the Ocean Drilling Programme," R. K. Stanley, Proc 4th European Conf on NDT, London, Sept 13-18, 1987.
  16. "Use of Inductive Ammeters to Ensure Saturation on Tubular Magnetic Materials Using the Internal Conductor Method," R. K. Stanley, Materials Evaluation 46(11) (1987).
  17. "Drill String Inspection for Deep Ocean Drilling," R. K. Stanley, Proc. NDE of Iron Conf (1988).
  18. "Magnetic Field Measurement: The Gaussmeter in Magnetic Particle Testing," R. K. Stanley, Materials Evaluation 47(3), (1989).
  19. "The Effect of the Recession in the Oil Industry on Oilfield Tubular Inspection," R. K. Stanley, NDT Intl. 22(1), (1989).
  20. "Ultrasonic Distances Useful in Oilfield Tubular Inspection," R. K. Stanley, Materials Evaluation 47(3) (1989).
  21. "The IPIA Method of Certifying Oilfield Drill Pipe Inspectors," R. K. Stanley, Proc. XIII World Conf. On NDT (Amsterdam), ed. J. Boogaard & G. M. van Dijk, Elsevier Science Publishers BV, Amsterdam.
  22. "Real Time Electromagnetic Tubular Inspection During Well Servicing," R. K. Stanley, Proc. NACE (Western Canada) Mtg., Calgary (1990).
  23. "Advanced Electromagnetic Tubular Inspection During Well Servicing," R. K. Stanley, Proc. 38th Annual Southwestern Short Course, Texas Tech Univ. (Apr. 1991), pp. 416-423.
  24. "The Present State of the Art in Magnetic Flux Testing," R. K. Stanley, Materials Evaluation 50(10) (1991).
  25. "Comments on the Threader Bar Technique for Magnetic Particle Inspection Magnetization, " R. K. Stanley, Materials Evaluation (Jan 1992).
  26. "Total Flux Magnetic Method for Inspection of Installed Ferromagnetic Tubing," James Kirkwood & R. K. Stanley, Materials Evaluation 50(4), pp. 502-5, (1992).
  27. "Assessment of Tubing in Oil and Gas Wells by NDE Methods, With Profiles of Tubular Damage," R. K. Stanley, Proc. 1st ASME/NDE Engineering Division Topical Conference, San Antonio, TX (Apr 1992).
  28. "The Imaging of Magnetic Flux Leakage Signals for High Quality Assessment of Oilfield Tubular Products," R. K. Stanley, Proc. Canmet. Conf (Jun 1992).
  29. "Advanced Electromagnetic Tubular Inspection During Well Servicing," R. K. Stanley, Proc. XIV Conf. On NDT, Sao Paulo, Brazil (Oct 1992).
  30. "Imaging of Magnetic Flux Leakage Signals for High Quality Assessment of Oilfield Tubular Products," R. K. Stanley, Proc. XIV Conf. On NDT, Sao Paulo, Brazil (Oct 1992).
  31. "The Inspection of Used Coiled Tubing," S. Papdimitriou & R. K. Stanley, Proc. 2nd Intl. Conf on Coiled Tubing Operations, Houston, Apr 1994. Pub. by Gulf Publishing.
  32. "Modern Methods in Magnetic Inspection," Proc 3rd EPRI Heat Exchanger Conf, Myrtle Beach, Jun 1994.
  33. "Magnetic Particle Inspection: Some Unsolved Problems," R. K. Stanley, Materials Evaluation 52(8), 1994
  34. "Repair Grinding - An Alternative to Ultrasonic Rejection for Oilfield Tubes," R. K. Stanley, Materials Evaluation 52(10), 1994.
  35.  "Recent Advances in Ultrasonic Drill Pipe Inspection," R. K. Stanley & Larry Wells, Materials Evaluation 52(11), 1994.
  36.  "Simple Explanation of the Theory of the Total Magnetic Flux Method for the Measurement of Ferromagnetic Cross-sections," R. K. Stanley, Materials Evaluation 53(1), 1995 pp. 72-5.
  37. "An Analysis of UT Amplitude Comparison Flaw Sizing and Dissection Results in Steel Pipe," Alan Bray and R. K. Stanley, Proc. ASME Energy Technology Conf. Houston, Tx (Jan 1995).
  38. "Magnetic Methods for Wall Thickness Measurements and Flaw Detection In Ferromagnetic Tubing and Plate," R. K. Stanley, Insight, Jan 1996.
  39.  "An Overview of the Nondestructive Inspection Techniques for Coiled Tubing," R. K. Stanley, Proc. Intl. Coiled Tubing Assn., Aberdeen, Sept 1996.
  40. "Overview of the Nondestructive Inspection Techniques for the Evaluation of Coiled Tubing and Pipe," R. K. Stanley, Materials Evaluation 54(11) pp. 1245-50, Nov 1996.
  41. " Overview of the Nondestructive Evaluation of New Coiled Tubing and Pipe," R. K. Stanley, Proc. ASME Energy Technology Conf, Houston, 1996.
  42. "Defects in Coiled Tubing," Proc. 4th World Oil Conf. On Coiled Tubing, Feb 1997, pub. by Gulf Publishing, Houston.
  43. "Failures in Coiled Tubing," R. K. Stanley, 5th Intl. Conf. On Coiled Tubing and Well Intervention, Feb 1997, pub. Gulf Publishing.
  44. "An Analysis of Failures in Coiled Tubing," R. K. Stanley, IADC/SPE Paper 39352, Proc. IADC/SPE Conf, Dallas, TX, Mar 1998.
  45. "Results from NDE Inspections of Coiled Tubing," R. K. Stanley, SPE paper 46023, Proc. SPE/Icota Conf, Houston, Tx Apr. 1998.
  46. "Progress Towards API Specifications for Coiled Tubing and Pipe," Alex Sas-Jaworsky and R. K. Stanley, SPE paper 46019, Proc. SPE/Icota Conf, Houston, Tx Apr. 1998.
  47. "Nondestructive Inspection Tools for Coiled Tubing," R. K. Stanley and K Varner, Proc. Brit. Inst. Of NDT Conf. Sept 1998.
  48. "Results of Recent Inspections Performed on Coiled Tubing," R. K. Stanley, SPE Paper 54484; Proc. SPE/Icota Conf., Houston, TX, Apr 1999.
  49. "Specifications and Principle Characteristics of Continuously Milled Coiled Tubing for Pipelines," R. K. Stanley, J. R. Martin and W. D. van Arnam, Offshore Technology Conference Paper 11060, Houston, Texas May 1999.
  50. "Testing of Coiled Oilfield Tubing - An Update," R. K. Stanley, Materials Evaluation Aug 2000, pp. 970-975.
  51. "The Manufacturing NDE of Amorphous Bonds in Oilfield Tubulars," Ryuzo Yamada, Takao Shimizu, Hirotugu Horio and R. K. Stanley, Materials Evaluation, Feb 2001.
  52. "Methods and Results of Inspecting Coiled Tubing and Line Pipe," R. K. Stanley, SPE Paper 68423, Proc SPE/Icota Mtg, Mar 3, 2001.
  53. "Continuously Tapered Coiled Tubing," R. K Stanley & J. R. Martin, SPE Paper 68881, Proc. SPE/Icota Mtg. Mar 3, 2001.
  54. "Inspection of Coiled Oilfield Tubing - A First Update," R. K Stanley, Materials Evaluation Aug 2000, pp 970-975.
  55. The Inspection of Coiled Oilfield Tubing - A First Update, R. R. Stanley, Proc. Intl. Chem. And Petroleum Inspection Conf, ASNT, Houston, July 2001.
  56. "HPHT Wells Create New Challenges Demanding Higher Level of Coiled Tubing Inspection and management," T. McCoy, R. Rosine, C. Aulert, J. R. Martin and R. K. Stanley, SPE paper 74830, SPE meeting, Houston, April 2002.
  57. "Improved Nondestructive Testing During Tubing Manufacture and Servicing,"  R. K. Stanley, J. R. Martin, T. McCoy, R. Rosine and C. Aulert, SPE paper 81734, SPE meeting, The Woodlands, April 2003.
  58. "Field Validation of Coiled Tubing Fatigue Model," F. R. Behenna, D, D. Myrick, R. K. Stanley, S. M. Tipton and W. A. Hammond, SPE paper 81726, SPE meeting, The Woodlands, April 2003.

download acrobat reader




NDE Information Consultants
rkstanley@ndeic.com

last updated September 12, 2003